Termite protection for new builds and existing properties
We provide pre-construction soil barrier treatment during foundation stages, and post-construction drilling and chemical injection for structures already built. A free site inspection comes first, so the treatment matches the property.
Three approaches, matched to the stage of the property
Pre-construction soil barriers are applied before the structure rises. Post-construction treatment reaches existing masonry. Porous pipe systems give sustained access for future retreatment.
Pre-construction foundation barriers
Chemical soil treatment is applied to the plinth and foundation trenches during construction, forming a barrier beneath and around the structure before concrete is laid.
Post-construction drilling and injection
For finished buildings, we drill at intervals along the walls and floor junctions, then inject treatment into the soil beneath and beside the structure. The work is planned after inspection to suit the layout.
Engineered porous pipe perimeter systems
Porous pipes are laid around the perimeter so treatment can be reapplied later through the same access points, without reopening the full site.
How the work is done
A structured protocol from evaluation to inspection
01 Technical evaluation
We assess construction stage, soil conditions, and the layout of the building before recommending a method.
02 Trenching or drilling
Trenches or drill points are prepared along the perimeter and at junctions where treatment is needed.
03 Chemical application
Treatment is applied to the soil and masonry at the planned points, with coverage recorded for the work.
04 Inspection
We inspect the completed work and explain the follow-up access points and the applicable service terms.